Hydro Therapy Swimming Pool

Location

Northern Ireland

Sector

Concrete & Structural Works

Construction of a reinforced concrete hydrotherapy pool, delivering a durable and purpose-built facility to support therapeutic care within a specialist education environment.

Project Description

Novo Remedial Solutions Ltd was appointed to deliver the construction of a new hydrotherapy pool designed to provide therapeutic benefits for students with special needs. The facility supports physical rehabilitation, relaxation and overall wellbeing within a safe and controlled environment.

The project required a carefully coordinated construction approach, ensuring structural integrity, durability and a high-quality finish suitable for specialist use.

Scope of Works

The works involved the full construction of the reinforced concrete pool structure, including preparation, formwork, reinforcement and concrete placement.

  • Detailed site assessments and measurements prior to construction
  • Preparation and modification of existing concrete base
  • Installation of formwork and shuttering systems
  • Placement and securing of steel reinforcement
  • Concrete pouring, compaction and finishing
  • Removal of shuttering and preparation for follow-on trades

Methodology

1. Site & Concrete Preparation

Multiple site visits were carried out to ensure accurate measurements and planning. Existing concrete was cut and prepared to allow correct installation of shuttering and ensure alignment with the design specification.

2. Reinforcement Installation

Steel reinforcement bars were installed in accordance with engineering requirements to provide structural strength and durability. All reinforcement was securely fixed to maintain stability during the concrete pour.

3. Shuttering & Formwork

Shuttering systems were constructed to define the pool structure. Quality checks were carried out to ensure integrity and prevent leakage during concrete placement.

4. Concrete Placement

Concrete was mixed and poured to specification, with vibration techniques used to eliminate air pockets and achieve a consistent, high-quality finish.

5. Finishing & Preparation

Once cured, the shuttering was removed and the structure inspected. Surfaces were prepared to a suitable standard for follow-on works, including tiling.

Outcome

The completed hydrotherapy pool provides a safe, durable and purpose-built environment that supports therapeutic use for students with special needs.

  • Robust reinforced concrete structure
  • High-quality finish ready for specialist installation
  • Designed to support long-term use and durability
  • Improved facilities for student care and rehabilitation

Conclusion

This project demonstrates Novo Remedial Solutions Ltd’s capability in delivering high-quality structural construction works within specialist environments. The completed facility provides a valuable addition to the school, supporting both physical and emotional wellbeing for its users.